Cost of Concrete Pool Deck Replacement in Pasadena
Replacing a concrete pool deck in Pasadena, CA, can be a significant investment, but it's essential for maintaining the aesthetics and safety of your pool area. Understanding the various factors that influence the cost and the common tasks involved can help you plan your budget more effectively.
Factors Affecting Cost
- Size of the Deck: Larger decks require more materials and labor, increasing the overall cost.
- Material Quality: Higher quality concrete and finishes can be more expensive but offer better durability and aesthetics.
- Design Complexity: Intricate designs and custom features can add to the cost due to the additional labor and materials required.
- Site Preparation: The condition of the existing deck and the amount of preparation needed can impact the cost.
- Accessibility: Easy access to the pool area can reduce labor costs, while difficult access may increase them.
- Local Labor Rates: Labor costs in Pasadena, CA, can vary, affecting the total cost of the project.
Average Costs for Common Tasks
Task | Average Cost (Pasadena, CA) |
---|---|
Demolition and Removal | $500 - $1,500 |
Basic Concrete Installation | $6 - $10 per sq. ft. |
Stamped Concrete | $10 - $15 per sq. ft. |
Colored Concrete | $8 - $12 per sq. ft. |
Concrete Sealing | $1 - $3 per sq. ft. |
Reinforcement (Rebar) | $2 - $4 per sq. ft. |
Drainage Installation | $500 - $2,000 |
Total Project Cost | $5,000 - $15,000 |